With demo mostly complete, the removal and installation of the new furnace and water heater as well as the framing began last week. Removing the old furnace was no small task. The steel beast was the size of a small car and had originally been lowered into the building with a crane. It took Mago and our good friend Kevin three days weilding a demo saw to cut the thing into pieces and send it off to the scrap yard.





It was even more exciting to see the framing for the master bedroom, closet, and bathroom go up. The floor for the loft was also installed.