Monday, August 22, 2011

Dirty Work








I should have been posting more often...but it was hard because every time I went over to the church - it looked the same. Funny how much work plumbing and wiring is without much apparent change to the property. The last big change was when Mago and Tripp took down the old ceiling to reveal a beautiful pattern of old beams - and created about three feet deep of debris throughout the building. It still amazes me that we ever got all the old lath and plaster and ceiling tiles all packed out. It looked like a bomb had gone off in the sanctuary. Check out the photo of Mago coming home after a day of clean up (clean up took a whole week and another 30 cubic yard trash bin.)





The new windows arrived and were installed throughout the main floor. It's still on the long term plan for me to take a stained glass class and do stained glass in the transoms and in the two new windows we're adding to the back of the sanctuary.



And the best news is that Mago passed the plumbing inspection. Just electrical, hvac, and framing to go and the we can start finish work.







































No comments:

Post a Comment